CO129-319 - Governor Sir Blake - 1903 [10-11] — Page 55

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All

53

22.

23.

will be settled

on

(b). The steam and feed piping wwill be sent out

(c).

receipt of this letter and when complete.

This should be in accordance with the arrangement of engines, and boilers shown on tracing B, the boilers being so connected as to be interchangeable with future briters. The exhaust convenient (vide Messrs Jangge's letter of 24th pipes may be arranged as found west, July, 1903);

"Full particulars of the trial works corried out and of the works now proposed -ed in this letter and its enclosures.

are contain

The mly other points to which I have to

mentioned in Mesors Tanguye's lettere

refer are some

to you of

the 24th July last.

I have fixed the width of the moine

engine

house

at 30 feet which should give ample room for the future 2-million gallon's plant, thus enabling our traveller to serve for all the

that a length of 82 feet will be required for the

engines.

I note

plant

engine of

2

m

Order and one additional

-million gallons capacity.

24.

the are

25.

The boiler fleres should be laid out to suit

arrangement

shown on

tracing B and I shall

be glad to receive full particulars of these when

settled.

The suction pipe might be kept inside

8.

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.